COVID-19 Temporary Briefing Facility

About

Temporary and transportable buildings to suit any situation. Responding fast to the current COVID-19 crisis and vaccine rollout is vital; our flexible floor plans and fast delivery means your facilities will be ready for use when and where you need them. 

Ausco has designed new concepts to answer all of our customer's needs. Ask our teams about temporary and transportable buildings today.

Specifications

Description

  • External plain metal door
  • Windows with flyscreens, security screen or bars*
  • Cut-outs for air conditioners
  • Diffused fluoro lights
  • Single socket outlets
  • Double socket outlets
  • Load centre

*Ask your representative for the window finishes available at your local branch.

12.0m

Long
×

9.0m

Wide